Metal structure erection
Our own crew and equipment on site, with no subcontracted lifting. Erection plan, safety and handover reviewed with you.
Our own crew
Whoever erects it answers for it
Erection is where the project becomes visible, and where problems tend to show up too. That's why it's done by our own crew, with our own equipment, following the plan engineering prepared.
With no subcontracted lifting, no one pushes the problem to another supplier. The company that answers for the structure is the same one that designed and fabricated it.
How erection moves forward
From the truck to a standing structure
Erection planning
Sequence, equipment and schedule defined before the first piece arrives.
Piece logistics
Numbered pieces leave the plant in the order they'll be erected.
Lifting plan
Every lift is planned in advance, with the equipment and the work area defined.
Structure erection
Columns, beams and bracing erected and checked for plumb and alignment.
Handover
Project reviewed with you and complete documentation.
Safety
Safety under Brazil's regulatory standards
Erection follows the NRs that apply to construction sites, work at height and load handling:
NR-18
Safety and health at work in the construction industry.
NR-35
Work at height.
NR-11
Transport, handling, storage and material handling.
Working site
Erecting alongside an active operation
In expansions and renovations, erection happens close to an ongoing operation. Planning defines the isolated areas, the schedule and the sequence before work begins.
See how it works in expansion and retrofit.
How it works
How your project moves forward
One person follows every stage. You know what's happening and when.
- 01
Briefing
We understand the operation, the site and the schedule.
- 02
Preliminary study
Feasibility, structural system and investment range.
- 03
Engineering
Structural design, detailing and coordination.
- 04
Fabrication
Cutting, welding and painting at our own plant, with inspection.
- 05
Logistics
Numbered pieces ship out in the order they'll be erected.
- 06
Erection
Our own crew, with a lifting and safety plan.
- 07
Handover
Project reviewed with you and complete documentation.
FAQ
Questions about erection
Do you subcontract erection?
No. Erection is done by our own crew, with our own equipment, with no subcontracted lifting.
How long until the structure is standing?
The erection schedule comes out of the preliminary study, with a date for every stage. Pieces arriving in the right order avoid waiting on site.
Who handles safety on site?
Our crew follows the lifting plan and NR-18, NR-35 and NR-11 during erection.
Do you erect outside of São Paulo?
Yes. We carry out projects in Brazil and Paraguay.
See also
Before erection
Next step
Have a metal structure project? Our engineering team will assess it.
Send us the project details and the drawings. You'll get feasibility, scope and what's missing to move forward.