Logistics warehouse and distribution center

High clear height, docks and floor prepared for heavy-duty operation. Large spans to store and ship out with fast throughput.

Built for the operation

The warehouse starts with the flow of goods

In a logistics warehouse, the structure works for the operation: the height defines how many storage levels fit, the column position defines the aisles, and the docks define the pace of shipping.

That's why the design starts with the storage layout and the in-and-out flow. The structure comes after, designed around that.

What weighs on the design

Where the structure makes a difference in logistics

  • Clear height and storage levels

    The usable height is planned together with the pallet racking and the fire suppression system.

  • Span and aisles

    The columns are placed into the aisle layout so they don't steal a pallet position.

  • Docks

    The dock facade is already designed with the door openings and loads accounted for in the calculation.

  • Floor and bases

    The structure is coordinated with the industrial floor and the foundations, which are concrete.

  • Roof

    Large roof areas require care with wind, drainage, gutters and flashing.

  • Growth in modules

    The warehouse can start with one module and grow in stages, if the design plans for it.

Logistics or distribution

What's the difference?

Both are used to store and move goods. A logistics warehouse tends to store for longer. A distribution center receives, sorts and ships out with fast turnover, so it tends to have more docks.

For the structure, what changes is the clear height, the span between columns and the number of openings. The preliminary study defines this based on your operation.

How it works

How your project moves forward

One person follows every stage. You know what's happening and when.

  1. 01

    Briefing

    We understand the operation, the site and the schedule.

  2. 02

    Preliminary study

    Feasibility, structural system and investment range.

  3. 03

    Engineering

    Structural design, detailing and coordination.

  4. 04

    Fabrication

    Cutting, welding and painting at our own plant, with inspection.

  5. 05

    Logistics

    Numbered pieces ship out in the order they'll be erected.

  6. 06

    Erection

    Our own crew, with a lifting and safety plan.

  7. 07

    Handover

    Project reviewed with you and complete documentation.

Steel or concrete

Steel or concrete? It depends on the project.

There's no single right material for everything. There's the right one for your span, your soil and your schedule.

Up to about 25 meters of span, precast tends to compete well. For larger spans, weak soil, or when the project will grow, steel tends to win. If your case is the other way around, we'll tell you. See the full comparison.

Comparison between metal structure and precast concrete
CriterionMetal structurePrecast concrete
Large spansExcellentDepends
IndustrializationHighMedium
Self weightLowerHigher
Erection speedHighDepends
Future expansionSimpleMore difficult
MaintenanceRequires corrosion protectionLower

Before you close a deal

Before comparing price, compare what's included

A price per square meter is misleading. Check whether the proposal includes:

  • Structural design and ART
  • Fabrication and painting or galvanizing
  • Transport to the job site
  • Erection with equipment
  • Who does the foundation
  • Gutters, flashing and closures
  • Schedule with dates

Our proposal lists every item separately. It's easy to compare. How to compare proposals, item by item

FAQ

Questions about logistics warehouses

What clear height do I need for pallet racking?

It depends on the height of the racking, the fire suppression system and the operation. We define it in the preliminary study, with your storage layout.

How much does a logistics warehouse cost?

It depends on the span, the height, the roof and the site. A price per square meter without a design is a guess. Send what you have and we'll come back with an investment range and scope. See what changes the cost.

Can it be built in stages?

Yes. The design can plan for the following modules, and each stage goes into operation as it's completed.

How long until the project is ready?

The schedule comes from the preliminary study, with a date for each stage. Fabricating while the foundation is being built shortens the timeline a lot.

Do you do the foundation?

Yes, or we coordinate with your builder. That's written into the proposal.

Next step

Have a logistics warehouse to get off the ground? Our engineering team will evaluate it.

Send us the project details and the drawings. You'll get feasibility, scope and what's still to define.

Send project